Concept Overview & Structural Design

A high-capacity stationary steel platform suspended from adjustable vertical drop down-rods, capable of holding up to 600 lbs of large storage totes and storage containers.

Step-by-Step Installation Blueprint

  • Locate ceiling joists and snap two chalk lines matching the $4times8text{-foot}$ rack footprint.

  • Bolt four ceiling angle brackets across two or three separate ceiling joists using 5/16-inch structural lag bolts.

  • Attach heavy-gauge vertical drop posts, adjusting them between 18 and 36 inches to align with desired overhead clearance.

  • Assemble the outer perimeter steel frame and drop in heavy wire grid decking panels.

  • Distribute weight evenly across the platform, placing the heaviest plastic totes over the center perimeter frame.

2